EasyManua.ls Logo

Key Automation CT10324 User Manual

Key Automation CT10324
108 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
STOP PH2 PH1 OPEN CLOSE PAR SBS
EDGE
PH2
PH1
ON
Istruzioni ed avvertenze per l’installazione e l’uso
Instructions and warnings for installation and use
Instructions et avertissements pour l’installation et l’usage
Anleitungen und Hinweise zu Installation und Einsatz
Instrucciones y advertencias para su instalación y uso
Instruções e advertências para a instalação e utilização
Instrukcje i zalecenia dotyczące instalacji i użytkowania
CT10324
Centrale per un motore 24 Vdc, per cancello scorrevole o portone basculante
Control unit for a 24 Vdc motor, for a sliding gate or up-and-over door
Logique de commande pour un moteur 24 Vdc, pour portail coulissant ou porte basculante
Central para un motor 24 Vdc, para puerta de corredera o portón basculante
Steuergerät für einen Motor 24 Vdc, für Schiebetor oder Schwingtor
Unidade para um motor 24 Vdc, para portão de correr ou portão basculante
Jednostka sterująca do silnika 24 Vdc obsługującego bramę przesuwną lub wahadłowe drzwi

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Key Automation CT10324 and is the answer not in the manual?

Key Automation CT10324 Specifications

General IconGeneral
BrandKey Automation
ModelCT10324
CategoryControl Unit
LanguageEnglish

Summary

Safety Warnings and Precautions

Original Instructions and General Safety

Key instructions for safe installation and use, emphasizing adherence to manual.

Pre-Installation Checks and Risk Assessment

Required checks before installation and the necessity of a professional risk assessment.

Installation and Operation Precautions

Safety measures during installation and operation, including avoiding modifications and liquid contact.

Maintenance Power Disconnection

Mandates power disconnection for cleaning, maintenance, and part replacement.

Electrical System and Usage Safety

Safety regarding electrical connections, usage by children, and pre-operation checks.

Installation Specifics and Hazard Prevention

Guidelines for installation, preventing crushing, and specific gate/door operational requirements.

Regular Examination and Disposal

Advice on regular checks for wear, disposal of packaging, and examination of installation integrity.

Product Introduction and Overview

Description of the control unit

Overview of the CT10324 control unit's features and capabilities for gate automation.

Description of the connections

Detailed explanation of the various connectors and their functions on the control board.

Models and technical characteristics

Lists the available models and their key technical specifications.

List of cables required

Specifies the types and maximum lengths of cables needed for system connections.

Pre-Installation Checks and Requirements

Product Installation Guide

4.1 - Electrical connections

Step-by-step guide for making the electrical connections to the control unit.

4.2 - Disabling the safety devices

Procedures for disabling safety devices like EDGE, PHOTOCELL 2, and PHOTOCELL 1.

4.3 - Display during normal operation

Explanation of status messages displayed by the LCD during normal operation.

Malfunctions

Lists common malfunctions, their causes, and associated LED indicator patterns.

4.4 - Autolearning of the travel stroke

Detailed process for the automatic learning of the gate's travel stroke and key parameters.

4.5 - Learning a transmitter

Instructions for memorizing remote control transmitters to the system.

4.5.2 DELETING A BUTTON OF A REMOTE CONTROL

Procedure for deleting a specific button from a memorized remote control.

4.5.3 CLEARING THE ENTIRE RECEIVER MEMORY

Steps to erase all memorized remote controls from the receiver memory.

4.6 - Default procedure

How to reset the system to factory default settings and change motor type.

4.7 - Customising the system - Basic menu

Guide to accessing and modifying basic system parameters via the menu.

Basic Parameters CT10324

Detailed table of basic parameters, their settings, min/max values, and units.

System Testing and Commissioning

5.1 Testing

Procedures for testing all system components and their correct operation.

5.2 Commissioning

Steps for commissioning the system after successful testing, including documentation.

Advanced Menu and Parameters

ADVANCED PARAMETERS CT10324

Detailed list and explanation of advanced parameters for system customization.

End User Instructions and Safety

General Advice for End Users

Key advice for end-users regarding system operation, safety, and maintenance.

Maintenance and Modification Guidelines

Recommendations for regular maintenance and strict prohibition of system modifications.

Cleaning and End-of-Life Procedures

Guidance on cleaning components and proper disposal of the system at its end of life.

Declaration of Incorporation