EasyManua.ls Logo

Keysight Technologies N5221A

Keysight Technologies N5221A
368 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-54 Keysight N5221A/22A Service Guide
Repair and Replacement Procedures
Removing and Replacing the Front Panel LED Boards
7-
Removing and Replacing the Front Panel LED Boards
Tools Required
T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
5/16 inch open-end torque wrench (torque to 10 in-lb or 1.13 N.m)
1 inch open-end torque wrench (torque to 72 in-lb or 8.15 N.m)
ESD grounding wrist strap
Removal Procedure
Refer to Figure 7-18 for this procedure.
1. Disconnect the power cord.
2. Remove the test port couplers. Refer to “Removing and Replacing the
A29–A32 Test Port Couplers” on page 7-41.
3. Remove two screws (item
) from the LED board to be removed and
remove the LED board from the analyzer.
Replacement Procedure
1. Reverse the order of the removal procedure.
2. Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to Table 7-2 on page 7-60.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables is necessary to remove assemblies but do not
over-bend them.

Table of Contents

Related product manuals