5.5 Initial commissioning of the sharpening machine
Place the sharpening machine at the installation site on a level base.
Remove the transportation locks on the doors.
Level out any floor unevenness by adjusting the machine feet (3-2/14) with a flat wrench (SW19).
Have a qualified electrician on site install the current supply.
Have the compressed air supply and the connection with the power supply installed on site by a
specialist.
Completely install and check the safety devices before commissioning.
Have all the protective devices checked for proper functioning by
authorised specialists before initial operation of the machine.
All work on the machine may only be performed by trained personnel.
The applicable safety and accident prevention regulations must be
observed.
Have all the protective devices (particularly the electrical safety circuits)
checked for proper functioning by authorised specialists before initial
operation of the machine.
Confirm that the machine is correctly connected to the compressed air
supply.
If the machine is connected incorrectly, escaping compressed air and
hurtled parts can lead to injuries.
Observing the local safety and accident prevention regulations for
compressed air is required.
CAUTION
5. Installation