5
4. Transport 24
4.1 Transport aids 24
4.2 Transport damage 24
4.3 Transport to another installation site 24
5. Installation 26
5.1 Selection of qualified personnel 26
5.2 Installation site 26
5.3 Supply connections 26
5.4 Settings 26
5.5 Initial commissioning of the sharpening machine 27
6. Commissioning 28
7. Operation 30
7.1 Grinding of hand knives 30
7.2 Changing the wet-grinding belt 32
7.3 Changing the polishing / deburring brushes and polishing paste 33
7.4 Adjusting the polishing / deburring brushes 34
7.5 Changing the test medium for the sharpness testing device 35
7.6 Changing the coolant 37
8. Control system 38
8.1 Manual Functions 38
8.2 Changing the language 39
8.3 Loading product data 41
8.4 Modifying product data 42
8.5 Setting up an internet connection 43
9. Care and maintenance 44
9.1 Lubrication 44
9.1.1 Lubrication schedule and lubricant table (single shift operation) 45
9.2 Cleaning 46
9.3 Maintenance Plan 49
Table of Contents