EasyManua.ls Logo

Kuka IONTECKR 70 R2100 - Concluding Work; Storage

Kuka IONTECKR 70 R2100
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fig. 10-2: Removing the robot
1 Sealing air connection (for Foundry only)
2 Ground conductor (2x)
3 Data cable X31
4 Motor cable X30
5 Fork slots (optional) attachment
6 Approved lifting accessory for lifting tackle
7 Hexagon bolts and locating pin
10.1.3 Concluding work
The following concluding work must be carried out:
Prepare the robot for storage if the robot is not to be reinstalled.
10.2 Storage
Description
For storage, the robot must be removed, cleaned and suitably covered.
Storage location
The storage location must meet the following requirements:
Virtually dry and free of dust
Avoid temperature fluctuations
Avoid wind and drafts
Avoid condensation
No exposure to direct sunlight
KR IONTEC
MA KR IONTEC V4 | Issued: 11.05.2021 www.kuka.com | 313/344
Decommissioning, storage and disposal

Table of Contents

Related product manuals