EasyManua.ls Logo

Kuka IONTECKR 70 R2100 - Installing PURGE Option C

Kuka IONTECKR 70 R2100
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Work safety
SAFETY INSTRUCTION
The following procedure must be followed exactly!
WARNING
Use of the option PURGE is limited to cleaning work. Use during run-
ning operation is precluded in order to prevent the emission of foreign
particles.
11.4.1.1 Installing PURGE option C
Procedure
1. Screw the holder for the pressure regulator and the pressure regulator
together to the plate using 2 M4x6-8.8 Allen screws (>>> Fig. 11-10).
2. Screw this assembly to the bracket with 2 M4x6-8.8 Allen screws.
3. Screw the air service unit to the bracket using 2 M4x10-8.8 Allen
screws with washers.
4. Position the bracket with assembly on the base frame and insert and
tighten 2 M6x16-8.8 hexagon bolts. Increase the tightening torque to
the specified value in several stages.
5. Connect compressed air hose to interface A1.
KR IONTEC
MA KR IONTEC V4 | Issued: 11.05.2021 www.kuka.com | 329/344
Options

Table of Contents

Related product manuals