EasyManua.ls Logo

Kuka KR C2 edition05 - Maintenance Procedures for KUKA Robot Controller; Robot Controller Maintenance Schedule

Kuka KR C2 edition05
157 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
87 / 157V3.3 11.07.2007 KRC-AD-KRC2ed05-BA en
9. Maintenance
9 Maintenance
9.1 Maintenance table
Maintenance table
Fig. 9-1: Maintenance points
Item Activity Time re-
quired [min]
Maintenance interval
1 Clean fan for inner
cooling circuit with
brush.
15 Depends on installation
conditions and degree of
fouling; however, no later
than every 2 years
Clean fan for outer
cooling circuit with
brush.
15
2 Clean heat ex-
changer with
brush.
15
Clean heat sink
with brush and
check that it is se-
curely fastened.
15
1 Exchange fan for
inner cooling cir-
cuit.
(>>> 10.2 "Exchan
ging the internal
fan" page 90)
20 5 years (with 3-shift op-
eration)
Exchange fan for
outer cooling cir-
cuit.
(>>> 10.3 "Exchan
ging the external
fan" page 91)
20

Table of Contents

Related product manuals