EasyManua.ls Logo

L-Acoustics A10 - Page 83

L-Acoustics A10
143 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging procedures
Preparing a block of enclosures
About this task
This procedure is optional and requires two operators
A single operator must assemble the enclosures one by one. Refer to Assembly (p.80).
Procedure
1. Separate the array into blocks of two or three enclosures.
Connect each enclosure on both sides before adding the new one.
SHLAK!
This step requires two operators.
Make sure all unused rigging arms are in storage position.
2. Position the enclosure blocks upright (logo on top) in two steps.
Tilt the enclosures on the rear. Tilt the enclosures upright.
3. Proceed as described in Assembly (p.80).
A10 owner's manual (EN) version 1.1 83

Table of Contents

Related product manuals