EasyManua.ls Logo

L-Acoustics A10 - Page 84

L-Acoustics A10
143 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging procedures
Disassembly
Procedure
1. Lower the array to the ground.
2. On each A10-LIFT, move the shackle to the setup point (hole 8).
setup point
1 2
3
4
5
6 7 8 9 10
11 12
13
FRONT
Make sure the pickup points are on hole 8 before lifting the array.
3. Raise the array until the bottom rigging is accessible.
4. Disconnect the enclosures at the bottom.
SHLAK!
Make sure all unused rigging arms are in storage position.
5. Lower the array to the ground.
84 A10 owner's manual (EN) version 1.1

Table of Contents

Related product manuals