EasyManua.ls Logo

LELY DISCOVERY 90 S - Maintenance; Preventive Maintenance Schedule

LELY DISCOVERY 90 S
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.4002.8501.0 B
Maintenance 6-1
6 Maintenance
6.1 Introduction
This chapter contains the preventive maintenance schedule and the applicable preventive maintenance
procedures for the Discovery. It also contains some basic corrective maintenance procedures.
6.2 Preventive Maintenance Schedule
The following table shows the preventive maintenance schedule. Preventive maintenance must obey local
regulations, if applicable.
The frequencies of the tasks shown in the table are the minimum frequencies
recommended.
Maintenance Tasks
Frequencies
Operating Weeks Operating Months
Note
Clean the Charging
Strips and the Charging
Electrodes (see page 6-
2).
1
Read the report list and
do any indicated
maintenance procedure
(see Report List on page
8-11).
2
Make sure the Battery is
Charging (see page 7-4).
1
Clean the Ultrasonic
Sensor (see page 6-4).
1
Replace the Manure
Scraper (see page 6-8).
3 - 6
Replace if broken or
cleaning insufficient.
in n o vato rs in ag ricu ltu r e

Table of Contents