Mechanical installation
Attaching operating unit
3
49
EDBPM−H310 DE/EN/FR 7.1
3 Mechanical installation
3.1 Attaching operating unit
The dimensions for the mounting cutout can be found in the "Technical data"
( 48)
How to mount the operating unit:
0
1
h310_006
1. Insert operating unit with seal into the mounting cut−out.
0VD
C
N
.C
.
LCD ADJ
+
24
VD
C
IN
PUT
:18
-
3
2
V
5W
FUSE
315
m
A
ASP8
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
2
1
3
4
2
2
h310_011
2. Insert mounting clamps into the slots at the operating unit.