EasyManuals Logo

LS Industrial Systems Metasol Series User Manual

LS Industrial Systems Metasol Series
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #73 background imageLoading...
Page #73 background image
72
Technical catalog for Susol & Metasol ACB
Technical catalog for Susol & Metasol ACB
F
2. Receiving and Unpacking
3. Installation Method
Securely install the left and right mounting frames with M12 bolts (4EA).
Installation of Fixed Type
A visual inspection - inside and out - should be performed immediately upon receipt of the ACB and before removing
it from the truck. Shipping papers should be checked to ensure all boxes or other accompanying pieces have been
received. If any damage or shortages are evident, a claim should be filed at once with the carrier, and the nearest
LSIS sales office. Claims for shortages or other errors must be made in writing to LSIS within 30 days after receipt of
ACB. Failure to do so constitutes unqualified acceptance and a waiver of all such claims by the purchaser.
Receiving
1. Before unpacking the breaker, check that all
boxes and packing are in good condition.
2. While unpacking, check the breaker is in good
condition.
3. Check that the information given on the rating
/accessory nameplates corresponds to the
purchase order.
4. Care about the unpacking to avoid damaging
the products. Unpacking them attentively to
avoid dropping the products from carrying
components and pallets.
5. Install the products to the final installation place
after unpacking as soon as possible. If you
cannot install the products immediately, you had
better not unpacking them. Keep the products indoor around 15° and under 50% of humidity. Standard packing
condition for domestic portage is not suited to outdoor storage.
If you cannot keep the maintenance above, you should inspect a degree of the damages before you install the
products. Unsuitable keeping does not guarantee good qualities of the products and could occur additional danger
of an accident.
Unpacking
3
(Below 2000AF
Below 4000AF 3P)
2
(Below 4000AF 4P)
1
(Below 6300AF)
4(6)- M12

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LS Industrial Systems Metasol Series and is the answer not in the manual?

LS Industrial Systems Metasol Series Specifications

General IconGeneral
BrandLS Industrial Systems
ModelMetasol Series
CategoryCircuit breakers
LanguageEnglish

Related product manuals