RESCUE PROCEDURE
This paragraph describes the procedures to follow, the controls to use in the event of a problem (breakdown of the lifting
platform or someone trapped in the basket) while the lifting platform is working.
When taking over the machine and regularly afterwards, the details of this procedure must be read and fully understood by
the operator and everyone whose duties are centred on activities in contact with the machine.
IN THE EVENT OF THE OPERATOR FALLING ILL – PRIORITY SYSTEM
- In the case where the user accidently triggers the basket emergency stop, the
person on the ground can take control of the nacelle from the backup and
maintenance control panel.
- Follow the instructions below.
- Switch the contactor 1 to Position A and hold it down to recover control of the
platform’s movements.
- Restart the engine 2.
- Proceed to lower the platform using the base controls.
t
IMPORTANT
t
Pay attention to any constructions or objects that may be under the lifting platform.
IN THE EVENT OF AN ACCIDENT OR MACHINE BREAKDOWN – EMERGENCY SYSTEM
Electrical breakdown
- When an accident occurs or a breakdown makes the electrical control boxes
unusable, the machine is provided with systems for manually performing all
the lifting platform’s movements.
- Lift the turret's left hand cover.
- Grab the pump lever 1 and place it in the pomp compartment 2.
t
IMPORTANT
t
During these operations the system does not control:
The Tilt safety system.
The Basket Overload safety system.
1
2
1
1
2
2
A
2 - 48
647533 (09/10/2015)
MAN'GO 12