Manitowoc Published 04-17-17, Control # 067-11 4-37
16000 HANGING MAX-ER® OPERATOR MANUAL SET-UP AND INSTALLATION
Connect Boom Straps
See Figure 4-20 for the following procedure.
The boom straps and links are shipped on the boom sections
as shown in View B.
1. Connect straps (1, View A) at top end of butt and each
insert, as follows:
a. Remove pins (3, View B) and rotate links (4) to
working position (View A).
b. Pin links (4, View A) in working position.
c. Remove pin (5, View A) from end of strap (1).
d. Rotate links (2, View B) rearward and pin to
adjacent strap with pin (5, View A).
NOTE If the boom length in use requires intermediate
suspension, see procedure on next page.