Manitowoc Published 04-17-17, Control # 067-11 4-11
16000 HANGING MAX-ER® OPERATOR MANUAL SET-UP AND INSTALLATION
Install 40 ft (12 m) Insert
See Figure 4-6 for the following procedure.
1. Attach lifting slings from assist crane to lifting lugs (1,
View B) on insert (2).
2. Lift insert (2) into position so fixed pins (3, View A)
engage hooked connectors (4) on insert (5).
3. Block under top end of insert (2, View B), lower insert
onto blocking, and disconnect lifting slings.
4. Attach lifting slings to top chords directly behind
connectors at top end of insert (5, View C).
5. Lift inserts to align bottom connecting holes.
6. Install pins (6, View D).
Pins (6) are stored in pockets in the lacings next to the
connectors.
7. Disconnect lifting slings.
Install Mast Top
See Figure 4-6 for the following procedure.
1. Attach lifting slings from assist to lifting lugs (1, View E)
on mast top (7).
2. Lift mast top (7) into position so fixed pins (3, View A)
engage hooked connectors (4) on insert (2).
3. Lower mast top onto foundation and disconnect lifting
slings.
4. Attach lifting slings to top chords directly behind
connectors at top end of insert (2, View F).
5. Lift insert to align bottom connecting holes.
6. Install pins (6, View D).
Pins (6) are stored in pockets in the lacings next to the
connectors.
7. Block mast so equalizer (8, View F) is clear of
foundation.
8. Disconnect lifting slings.
9. Using assist crane, lift wire rope from Drum 5 onto top of
mast and spool slack wire rope onto drum.
Legend for Figure 4-6
Item Description Item Description
1 Lifting Lug (4 places) 5 Insert — 20 ft (6 m)
2 Insert — 40 ft (12 m) 6 Pin with Safety Pin (2 places)
3 Fixed Pin (2 places) 7 Mast Top
4 Hooked Connector 8 Boom Hoist Equalizer