Manitowoc Published 04-17-17, Control # 067-11 4-27
16000 HANGING MAX-ER® OPERATOR MANUAL SET-UP AND INSTALLATION
Install Boom
Assemble Boom Butt and First Insert
See Figure 4-14 for the following procedure.
1. Lift boom butt (1) off trailer and place on blocking in front
of the crane as shown in View A.
Lift with slings from assist crane attached to four lifting
lugs on butt.
Adjust blocking so top end of butt is square in relation to
foundation.
2. Disconnect lifting slings.
3. Lift insert (2) into position at front of boom butt (1).
Lift with slings attached to four lifting lugs on insert.
4. Engage fixed pins (3, View B) in insert with hooked
connectors (4) in butt.
5. Lower insert until bottom connecting holes line up.
6. Install bottom connecting pins (5, View B).
Pins (5) are stored in pockets in the lacings next to the
connectors.
7. Block under top end of insert.
8. Disconnect lifting slings.
Install Boom Butt and First Insert
See Figure 4-14 for the following procedure.
1. Attach lifting slings from assist crane to top chords of
boom butt and insert.
Adjust position of slings so butt and insert are
horizontal when lifted.
2. Lift butt and insert into position at connecting holes in
front of rotating bed (View F).
3. Disconnect hydraulic hoses 7a, View C) from couplers
(7b) in boom butt. Thoroughly clean couplers.
4. Connect hydraulic hoses (7a, View D) to couplers (6c)
on left side of rotating bed.
5. Using crane setup remote control, disengage boom
hinge pins (8, View E).
6. Position butt so connecting holes in butt line up with
connecting holes in rotating bed.
7. Center butt between rotating bed lugs and check side
play. If total side play is greater than 5/64 in (2 mm),
install shims (10, View F) as follows:
a. Install thickest shim possible between inboard side
of butt and rotating bed lug on both sides of crane.
Shim tabs must face inward and rest on rotating
bed lugs.
b. Install next thickest shim possible between inboard
side of butt and first shim on both sides of crane.
c. If possible, install thinnest shim between inboard
side of butt and second shim on both sides of crane.
8. Using crane setup remote control, engage boom hinge
pins.
9. Remove locking pins (9, View E) from shipping position
and install in working position.
10. Lower end of insert onto blocking (View G).
11. Disconnect lifting slings.
12. Disconnect hydraulic hoses (7a, View D) from couplers
(7c) on rotating bed and connect to couplers (7b, View
C) in butt.
See Figure 4-15
for the remaining steps.
13. Connect hydraulic lines from boom butt to crane:
a. Remove dust covers from couplers on boom butt
and from couplers and hydraulic hoses on rotating
bed. Thoroughly clean couplers.
b. Connect hydraulic hoses and couplers on rotating
bed to couplers on boom butt, shown in Figure 4-15
.
NOTE These are straight line connections. No hoses will
cross when hoses are connected correctly.
On current production cranes, the hoses and
couplers between the boom butt and rotating bed
have numbered tags. To ensure proper connection,
match the numbers on the tags.
Coupler-assist tool (View C) can be used to
connect the large couplers.
Continued on page 4-31
.
CAUTION
Wire Rope Guide Damage!
If raised, lower wire rope guide on boom butt (View A).
Otherwise, wire rope guide will hit mast when boom is
raised.