OPERATING CONTROLS AND PROCEDURES 16000 HANGING MAX-ER® OPERATOR MANUAL
3-4
Published 04-17-17, Control # 067-11
CONTROL SYMBOLS IDENTIFICATION
The following symbols are used on the remote control.
COUNTERWEIGHT REQUIREMENTS
See Section 4 of this manual and MAX-ER Capacity Charts
for counterweight identification and requirements.
MAX-ER OPERATION — GENERAL
Cylinder — Extend
Counterweight, Hanging
Energize (turn on)
Set-Up (remote)
Stop, Emergency
FIGURE 3-1
HM3-2
Cylinder — Retract
STOP
FIGURE 3-2
Item Description
1 Power Switch
2 Counterweight Lifting Cylinder Switch
3 Emergency Stop Switch
P2425
2 1 3
Remote Control Mounted on Beam Assembly
WARNING
Tipping Hazard!
Tipping or structural damage can occur if proper
counterweight is not installed.
Do not operate crane with hanging MAX-ER until proper
counterweight is installed.
WARNING
Prevent Death or Serious Injury to Personnel!
Hanging MAX-ER attachment must be installed and
operated by experienced personnel trained in erection
and operation of construction cranes.
These personnel shall read, understand, and comply with
instructions in this section, in Section 3 of Crane
Operator Manual, in Section 3 of Luffing Jib Operator
Manual, and in RCL Operation Manual.