16000 HANGING MAX-ER® OPERATOR MANUAL SET-UP AND INSTALLATION
Raise Mast Stops
See Figure 4-7, View A for the following procedure.
Perform the following steps on both sides of mast butt.
1. Support mast stop (1) with lifting sling from assist crane.
2. Remove pin (2) securing mast stop to storage bracket
(3).
3. Raise mast stop to working position.
4. Raise strut (4) to working position and pin to mast stop
with pin (2).
Lower Wire Rope Guide
See Figure 4-7, View B for the following procedure.
1. Support wire rope guide (5) with a lifting sling from assist
crane.
2. Remove pins (6) and lower links (7) to vertical. Each link
weighs 20 lb (9 kg).
3. Lower wire rope guide (5) to working position.
4. Pin links to wire rope guide.