16000 HANGING MAX-ER® OPERATOR MANUAL SET-UP AND INSTALLATION
Disconnect Beam from Counterweight —
SEQUENCE 2
See Figure 4-30 for the following procedure.
1. Connect lifting slings from assist crane to proper lifting
lugs on beam assembly (see Figure 4-25
).
2. Raise beam assembly with assist crane just enough to
lift beam support off ground.
3. Raise beam support (8, View D) to assembly position:
NOTE The hand winch has an automatic brake which
applies to hold the beam support in position when
you stop turning the handle.
a. Remove pins (11, View E) from assembly position.
b. Using hand winch, raise beam support to stored
position and install pins (11, View E).
4. Lift beam assembly just enough to loosen pins (7, View
A).
5. Remove pins (7, View A).
6. Lift beam assembly away from counterweight tray (6).
7. Remove ladder (2) from slots (5, View F) on right side of
beam assembly.
8. Remove ladder (2, View F) from slots in right side of
beam assembly.
9. Place beam assembly on ground as shown in View F,
Figure 4-25
).
10. Disconnect lifting slings and remove assist crane.
11. Store pins (7) in beam assembly (1) or beam insert (2).
12. Store ladder (3, View B).
Disassemble Beam Assembly
Beam assembly (1, View E, Figure 4-25) and beam inserts
(2) can be shipped as an assembled unit or they can be
disassembled.
Disassembly is the reverse of assembly.
Disassemble Hanging Counterweight
Disassembly is the reverse of assembly.