EasyManua.ls Logo

Manitowoc MAX-ER 16000 - Install Intermediate Suspension

Manitowoc MAX-ER 16000
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
Manitowoc Published 04-17-17, Control # 067-11 4-39
16000 HANGING MAX-ER® OPERATOR MANUAL SET-UP AND INSTALLATION
4
Install Intermediate Suspension
See Figure 4-20 and Figure 4-21 for the following procedure.
NOTE See the Boom Assembly Drawing at the end of this
section to determine if intermediate suspension is
required.
Perform the following steps on both sides of the
boom.
1. Remove standard connecting pin (5, View A) from rear
holes in links (2) and strap (1).
2. Using pin (6) – stored in lug on intermediate suspension
link (7) – pin links (2) and links (7) to strap (1, View C).
3. Store standard connecting pin (5) in lug on link (7, View
C).
4. Remove standard connecting pin (19a) from bottom
insert connectors (View C) and store pins in pockets on
insert.
5. Pin link (18, View C) between inserts.
6. Pin link (16, View C) to link (18).
7. Pin link (15, View C) and link (13) or pendant (9) to link
(16).
If links (13) are used, be sure to pin pendants (9) to
proper link holes — top or bottom — depending on boom
length.
8. If used, pin pendants (10) to pendant (9).
9. Pin pendant (9 or 10) to links (7).
When the boom is raised, the boom straps lift the
intermediate suspension into position to support the inserts.

Table of Contents

Related product manuals