SET-UP AND INSTALLATION 16000 HANGING MAX-ER® OPERATOR MANUAL
4-44
Published 04-17-17, Control # 067-11
A1284
Item Description Item Description
1 Wire Rope Guide 5b Pin
2a Lower Boom Point 6 Weight
2b Extended Upper Boom Point (lower sheaves) 7 Lift Plate
3a Standard Upper Boom Point 8 Load Block
3b Extended Upper Boom Point (upper sheave) 9 Weight
4 Block-Up Limit Switch 10 Lift Block
5 Chain 11 Weight Ball
5a Shackle
• Lower Boom Point (multiple part)
• Upper Boom Point (2-part)
Dead-End Load Line or
Slowest Live Line
5
6
5a
5a
• Upper Boom Point (1-part)
5
9
5b
5b
Location of Components at Boom Top Shown
Location of Components at Jib Tops is Similar
See Load Block Reeving Diagrams for
Suggested Location of Weight with
Multiple Part Reeving
1
3a
Single Part
Reeving
8
5
6
7
FIGURE 4-24
4
5
4
Multiple Part Reeving
Dead Ended at Boom
11
10
9
6
2a
A10868-atb1