EasyManua.ls Logo

Manitowoc MAX-ER 16000 - Page 158

Manitowoc MAX-ER 16000
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
SET-UP AND INSTALLATION 16000 HANGING MAX-ER® OPERATOR MANUAL
4-92
Published 04-17-17, Control # 067-11
FIGURE 4-52
Item Description
1 Main Hoist (Drum 1 in boom butt)
2 Whip Hoist (Drum 2 in crane)
3 Auxiliary Hoist (Drum 3 in boom butt)
4 Wire Rope Guides (in mast butt)
5 Wire Rope Guides (in insert)
6 Wire Rope Guide (on boom top)
7a To Lower Boom Point
7b To Extended Upper Boom Point (lower sheaves)
8a To Standard Upper Boom Point
8b To Extended Upper Boom Point (upper sheave)
2
6
7a
8a
2
1
6
7b
8b
Standard
Upper Boom Point
Extended
Upper Boom Point
7a
1
3
5
NOTE Refer to Wire Rope Specifications Chart for line
pull of drums. Drums 2 and 3 do not have same
line pull as Drum 1.
Drum 2 has a high-speed option. This option does
not increase line pull – only speed. High-speed is
approximately 80% faster than standard speed
(depending on load and layer).
4
4

Table of Contents

Related product manuals