EasyManuals Logo

Maxon GPTWR-25 Installation Guides

Maxon GPTWR-25
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #47 background imageLoading...
Page #47 background image
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
47
STEP 11 - INSTALL OPENER & LICENSE PLATE
BRACKET WITH ICC BUMPER OR UNDERRIDE
1. Lower platform to ground level
(FIG. 47-1). Refer to operating in-
structions in Operation Manual.
LOWERING PLATFORM
FIG. 47-1
POSITIVE (+)
BATTERY POST
WARNING
!
To prevent accidental personal injury
and equipment damage, disconnect
(-) battery cable and (+) cable from
battery.
2. Disconnect power to the pump by
disconnecting negative (-) and positive
(+) cables from battery (FIG. 47-2).
Reinstall nuts on negative (-) and posi-
tive (+) battery terminals.
NEGATIVE (-)
BATTERY CABLE
NEGATIVE (-)
BATTERY POST
NUT
POSITIVE (+)
BATTERY CABLE
DISCONNECTING BATTERY POWER
FIG. 47-2
INSTALLATION WITH ICC BUMPER
NOTE: If Liftgate is equipped with underride, skip these instructions for installation with
ICC bumper. Go to the instructions for INSTALLATION WITH UNDERRIDE.

Other manuals for Maxon GPTWR-25

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Maxon GPTWR-25 and is the answer not in the manual?

Maxon GPTWR-25 Specifications

General IconGeneral
BrandMaxon
ModelGPTWR-25
CategoryAutomobile Accessories
LanguageEnglish

Related product manuals