11921 Slauson Ave.  Santa Fe Springs, CA.  90670  (800) 227-4116  FAX (888) 771-7713
43
STEP 6 - CONNECT GROUND CABLE
CONNECTING EXTERNAL 
GROUND CABLE
FIG. 43-1
TERMINAL LUG
(EXTERNAL GROUND 
CABLE)
NOTE: To ensure power unit is correctly grounded, connect 2 gauge ground cable 
to grounding connection on pump.
NOTE:  Electrical lines must be run into pump box through sealing grommets 
  (FIG. 43-1A). To ensure a good seal on the electrical lines, never 
    cut the sealing grommets.
1. Insert external ground cable (parts box) 
through grommet on pump mounting 
plate (FIGS. 43-1 & 43-1A).
2. Attach ground cable to ground 
connection on pump using existing 
nut (FIGS. 43-1 & 43-1B).
3. Form a drip loop on the ground 
cable where it enters the grommet 
from outside the pump mounting 
plate (FIGS. 43-1 & 43-1B).
INSERTING GROUND CABLE 
THROUGH GROMMET 
FIG. 43-1A
BOLTING GROUND CABLE TO PUMP 
FIG. 43-1B
GROUND
CABLE
GROMMET
PUMP MOUNTING 
PLATE
NUT
GROUND 
CONNECTION
DRIP LOOP