EasyManua.ls Logo

Megger DET2/3 - Test Modes: Manual and Graphical

Megger DET2/3
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DET2/3
11
Operation
Test leads and terminal connections
Test lead set-up and terminal connections are described as part of the test procedure.
Important: When the instrument is connected to electrodes, make sure that all leads and cables are fully
unwound and laid out without loops.
Important: When running test leads out to each remote spike, take care not to lay them close to each other.
This is to minimise the effect of mutual inductance. Test leads must be spread out at least one metre apart.
Test modes
The instrument can operate in two modes to do a test:
Manual mode
In manual mode the test result can be shown as a single digital read out result, or as a continuously updated
digital read out result.
Continuous graphical mode
In continuous mode a continuous updated graph is displayed.
Green line: Measurement line
Black Line: Recorded average
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com

Table of Contents

Related product manuals