DET2/3
20
Continuity Test
Continuity Test
Warning: Make sure the circuit is de-energised, before the instrument is connected for measurement.
Note: To remove any test lead resistance in the test result, Null the test leads (see Null test leads (page 21)).
Test procedure
1
Set function to
4P
4P
3P
3P
2P
A
2 Set the mode
MAN
OFF
3 Connect test leads to instrument
C1
CAT IV 300V
P1
P2
C2
E
ES
S
H
I
V
E
X
Y
V
MVC1010 MVC1010
MCC1010
I
Start test
Manual mode Continuous graphical mode
4
Press to start
TEST
Press
TEST
Clear: Stop the current data stream and restart the graph.
Average: Activate / deactivate the average display.
End test
5
Press to stop
TEST
Press
TEST
OR