EasyManua.ls Logo

Meler Macro Series - Installation Procedures and Requirements; Installation Prerequisites and Space

Meler Macro Series
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
3-1
MA-5052-ENG MACRO SERIES MELTER MANUAL
3. INSTALLATION
Warning: The melters are equipment with current technology and with certain
foreseeable risks. Therefore, only allow qualified personnel withsufficient
training and experience to use, install or repair this equipment.
Introduction
The Macro series melters are delivered with all the materials necessary
for their installation. However, some components must be provided by the
user himself, according to the location and connections in each particular
installation:
Anchoring screws for the melter equipment if required.
Power cord and plug for electrical power.
Pneumatic conduct and connection to the compressed air system.
Multicore cable for external electrical control.
Optionally, a gas ventilation system.
Installation requirements
Before installing Macro series melter equipment, we must make sure that
the space assigned to it permits installing, connecting and using the entire
system. Similarly, we must check to see that the electrical and pneumatic
supplies meet the necessary requirements of the melter equipment being
installed.
Free space
F
E
G
A
B
D
C

Table of Contents