Operating Instructions - Synchroprint 3000 (Manual-Registration Version)
________________________________________________________________________________
Operating Instructions - Synchrprint 3000 (Manual-Registration Version) V1-1 Page 16 of 49
5. Commissioning the Synchroprint 3000.
After the initial start-up of the machine, commissioning is to be completed in the presence of the
authorized technician along with any persons authorized on the part of the customer. During this
initial start-up and commissioning, all tasks carried out by the MHM service engineer or the
technicians of an authorized dealer are recorded.
This installation/jobsheet must be clearly signed by both parties, stating the date and location of the
Synchroprint 3000 and will be legally binding hereon after.
All further start-ups of the Synchroprint 3000 by the customer or its authorized staff should be done
in accordance with the following procedures:
5.1. Start-up Instructions
1. Prior to each start-up, any possible defects are to be rectified by an MHM
authorized/approved technician.
2. The machine must only be operated by qualified personnel with a clear knowledge and
observation of all safety instructions.
3. Ensure that only authorised staff are permitted within the area of the Synchroprint 3000 and
that no persons are endangered upon starting up the machine.
4. Before putting the machine into operation, all electrical connections and air-supply levels
must be checked and the correct supply restored if necessary.
5. All safety facilities/devices must be checked prior to starting up the machine.
6. Make sure that all tools and foreign parts have been removed from the machine prior to
start-up.
7. Ensure that the operators are aware of the function and position of all safety
devices/facilities.