EasyManua.ls Logo

Miele DO 7860 - Descaling the Steam Injection System; Descaling Process Sequence

Miele DO 7860
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cleaning and care
128
Descaling the steam injection
system
When to run the descaling process
The descaling process can be run at
any time.
However, to ensure that the Dialog oven
functions correctly, you will be
automatically prompted to run the
descaling process after a certain
number of programmes.
The oven will count down in the display
the last 10 programmes that can be run
before it needs to be descaled. You will
then not be able to run any function or
Automatic programme using moisture.
These functions can only be used again
after you have carried out the descaling
process.
All other functions and Automatic
programmes without moisture can still
be used.
Descaling process sequence
Once the descaling process has been
started, it must be completed through
to the end. It cannot be cancelled.
The descaling process takes approx.
90minutes and consists of several
steps:
1. Preparing the descaling process
2. Drawing in the descaling solution
3. Activation phase
4. Rinse 1
5. Rinse 2
6. Rinse 3
7. Evaporating residual moisture

Table of Contents

Related product manuals