EasyManua.ls Logo

Millipore Milli-Q Integral 3 - Page 38

Millipore Milli-Q Integral 3
153 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
Main Cabinet tubings, cables and power cord, Continued
Reservoir
connections
The tubings from Milli-Q Cabinet Ports 7 and 9 are connected to the
Reservoir as shown here.
NOTE:
The valve where the tubing from Port 7 is connected must be opened.
Feedwater
tubing to pipe
Install the feedwater tubing as shown here.
Note that the assembly of fittings has a strainer inside.
This is called the Inlet Strainer for Milli-Q for the remainder of this User
Manual.
Continued on next page

Related product manuals