EasyManua.ls Logo

Mindray Accutorr 3 - NIBP Test

Mindray Accutorr 3
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-4
4.2.4 NIBP Test
4.2.4.1 Leakage Test
NOTE
Perform NIBP leakage test before any other NIBP test and calibration.
Tools required:
Adult NIBP Cuff
NIBP Hose
Cylinder
Follow this procedure to perform the leakage test:
1. Press the
button to set the patient category to adult ( ).
2. Connect the NIBP cuff to the NIBP connector on the monitor.
3. Apply the cuff to the cylinder as shown below.
4. Start the monitor. Within 10 s after you hear a beep, press and hold the
button to enter the Maintenance mode.
5. Press the button to enter the NIBP leakage test interface. In the PR
parameter area, code 550 is displayed.
6. Press the button to start leakage test. The real-time pressure is displayed
at the top of the screen.
Pressing the button with test in progress will terminate the leakage test.
Monitor
Connector for NIBP cuff
NIBP Hose
Cylinder
Cuf
f

Table of Contents

Other manuals for Mindray Accutorr 3

Related product manuals