2. Safety instructions | 2.4 - Before operational startup | 10
2.4 Before operational startup
NOTICE
Visual inspection!
Before operational startup as well as after storage or transport, inspect the
product visually for signs of mechanical damage.
The device should not be put into operation if it displays signs of visible
damage and/or is defective.
2.4.1 Installation
The device has to be installed in an EMC-compliant manner, see
ChapterEMC-compliant installation.
The panel device is suitable for control cabinet mounting. The table-top de
vice is suitable for table-top, wall mount or poles mount installations.
Component Protection class Installation
Panel housing:
Front and side panels
IP64
Panel housing:
rear panel
IP30
Control panel cut-out
Table-top housing: com
plete
IP65
To ensure proper cooling of the device, make sure air circulation around the
device is not blocked. Avoid exposing the instrument to excessive heat, e.g.
from direct sunlight and vibrations. The ambient conditions specified in Chap
terAmbient conditions must be observed at all times.
With outdoor mounting, make sure that adequate weather protection is pro
vided (for temperatures, see ChapterAmbient conditions).