3-73
Parallel I/O unit
3 Controller
■ Installation method
The expansion parallel input/output unit is installed outside of the controller. Connect with the network
connection cable (NETcable-1) from the RIO connector in the rear/into of the controller.(Terminator is connected
at the time of shipment)
Fig.3-25 : Installing the parallel I/O unit
60
54 6
Radiation/wiring space
150
6
156
2-M5 screw
6
168
Heat radiation space
128
(175)
100
Wiring
space
(40)
<2A-RZ361>
Installation dimensions of 2A-RZ361
6
downside
upside
Control panel installation dimensions
(The controller outside installation.)
Controller rear
RIO
*The connector of machine cable connection
has some from which form differs.