EasyManua.ls Logo

Mocom SUPREME 17 - 2 nd Pressure Rise

Mocom SUPREME 17
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sterilizers SUPREME - FUTURA - CLASSIC (17-22-28)
- TECHNICAL MANUAL
24
FUNCTIONING
EN
4.6. 2nd PRESSURE RISE
This phase is similar to the 1
st
PRESSURE RISE and brings the pressure from the negative value reached during
vacuum pulse to 1.00 bar.
The sequence of vacuum pulses and pressure rises allows eliminating almost totally the residual air from the
sterilization chamber, which is also discharged from any hollow bodies or porous materials belonging to the load.
The elimination of air will allow for an optimal diffusion of steam, ensuring the same temperature in all the areas of
the load.
2
st
PRESSURE RISE - component activation status
STATU
S
EV1
High drain
(N.O.)
EV2
Air inlet
(N.C.)
EV3
Low drain
(N.C.)
EV4
Drain
deflector
(3V)
EV5
Chamber
air inlet
(N.C.)
FAN
WATER
PUMP
- EV6
VACUUM
PUMP
CHAMBER TUBE
BUNDLE
HEATING ELEMENT
GENERATOR
HEATING ELEMENT
Part 1
from -
0.80
to 0.00
Off
open
On
open
Off
closed
On (1)
Off
closed
ON
ON
OFF
ON
ON
Part 2
from 0.00
to 1.00
Off
open
Off
closed
Off
closed
Off (2)
Off
closed
ON
ON
OFF
ON
ON
134° C B Cycle - 4’00’

Table of Contents

Related product manuals