EasyManua.ls Logo

Mocom SUPREME 17 User Manual

Mocom SUPREME 17
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
CEFLA S.C. Via Selice Prov.le 23/A - 40026 Imola (BO)
After Sales Service
tel. +39 0542 653566 -
Fax +39 0542 653596
E-mail: service.sterilization@cea.it
Technical manual
code 97071257 rev. 00
SUPREME (17-22-28)
FUTURA (17-22-28)
CLASSIC (17-22-28)
Series 2019

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Mocom SUPREME 17 and is the answer not in the manual?

Mocom SUPREME 17 Specifications

General IconGeneral
BrandMocom
ModelSUPREME 17
CategoryLaboratory Equipment
LanguageEnglish

Summary

General Warnings

Foreword

Introduction to the technical manual and manufacturer details.

Safety Instructions

Details safety symbols and their meanings for safe operation.

Packing and Transport

Transport and Storage

Instructions on handling, storing, and opening the packaged device.

Damage During Shipment

Procedure for handling and reporting damage discovered upon delivery.

Guidelines - Safety Test - Validation (If Required)

Checks Required for the Drafting of Conformity Report

Details visual, electrical, and functional checks for conformity reports.

Conformity Report

Template for recording conformity report details and test results.

Application Example with Instrument Secutest SIII+ on Sterilizer or Thermodisinfector

Step-by-step guide for performing safety tests using specific equipment.

Indications for the Solution of Non-Conformities Detected in the Test

Guidance on resolving issues identified during safety tests.

Functioning

Pre-Heating

Description of the pre-heating phase and its impact on components.

Warm Up

Details the warm-up phase, heating components, and temperature monitoring.

1st Vacuum Phase

Explains the first vacuum phase and its component activation status.

1st Pressure Rise

Describes the first pressure rise phase and component activation.

2nd Vacuum Phase

Details the second vacuum phase and its component activation status.

2nd Pressure Rise

Explains the second pressure rise phase and component activation.

3rd Vacuum Phase

Describes the third vacuum phase and its component activation status.

3rd Pressure Rise

Details the third pressure rise phase and component activation status.

Sterilization Process

Defines the balancing and process phases, including pressure/temperature limits.

Discharge

Explains the drainage phase and component activation during pressure decrease.

Drying

Describes the drying phase for eliminating residual humidity and steam.

Pressure Levelling

Details the pressure levelling phase for cycle end and door opening.

Service Menu

Autoclaves with Root Valve REF.7A24, 7A34, 7A44, 7A54

Service menu access and functions for specific autoclave models.

Functions Available Only in the App easyaccess

Describes features exclusively accessible through the easyaccess application.

Alarms / Errors / Warnings / Troubleshooting

Error Alarms - Code “E”

Lists and explains error codes starting with 'E' and their causes/solutions.

Fault Alarms - Code “A”

Lists and explains fault codes starting with 'A' and their causes/solutions.

Danger Alarms - Code “H”

Lists and explains danger codes starting with 'H' and their causes/solutions.

Accessory Alarms - Code “S”

Lists and explains accessory codes starting with 'S' and their causes/solutions.

Technical Sheets

Technical Sheet ST01 - Steam Generator (On All Models)

Details the steam generator's characteristics, operation, and replacement procedures.

Technical Sheet ST02 - Manifold

Describes the manifold's solenoid valves, operation, and service procedures.

Technical Sheet ST03 - Door Closing Unit

Explains the door closing and locking system, including replacement steps.

Technical Sheet ST04 - Pressure Transducer - Safety Pressure Switch

Details the pressure transducer and safety pressure switch functions and replacement.

Technical Sheet ST05 - PT1 Probe - Chamber Temperature Reading

Describes the PT1 probe, its function, and calibration process.

Technical Sheet ST06 - Door Adjustment

Provides information on optimal door position and adjustment procedures.

Technical Sheet ST07 - Conductivity Sensor

Explains the conductivity sensor's location and replacement procedure.

EV7 Technical Sheet - Solenoid Valve EV7 (Present Only on “Supreme” Model)

Details the EV7 solenoid valve, its function, and service operations.

Vibration Pump Unit Technical Sheet

Describes the vibration pump unit, its function, and replacement process.

Related product manuals