EasyManua.ls Logo

MPP Solar MPI 12KW WP - Application with Energy Meter

MPP Solar MPI 12KW WP
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
11. Application with Energy Meter
With Modbus card II and energy meter, hybrid inverter can be easily integrated into the
existing household system. For details please refer to Modbus card II manual.
Note: this application is only valid for Grid-Tie with Backup II mode.
Equipped with Modbus card II, hybrid inverter is connected to energy meter with RS485
communication port. It’s to arrange self-consumption via Modbus card to control power
generation and battery charging of the inverter.

Related product manuals