EasyManuals Logo

MPP Solar MPI 12KW WP User Manual

MPP Solar MPI 12KW WP
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
21
13. Initial Setup
Before inverter operation, it’s required to set up “Operation Mode” via software. Please
strictly follow below steps to set up. For more details, please check software manual.
Step 1: After turning on the inverter and installing the software, please click “Open
Monitor” to enter main screen of this software.
Step 2: Log in into software first by entering default password “administrator”.
Step 3: Select Device Control>>MyPower Management. It is to set up inverter
operation mode and personalized interface. Refer to diagram below.
Mode
There are three operation modes: Grid-tie with backup, Grid-Tie and Off-Grid.
Grid-tie with backup: PV power can feed-in back to grid, provide power to the
load and charge battery. There are four options available in this mode: Grid-
tie with backup I, II, III and IV. In this mode, users can configure
PV power
supply priority, charging source priority and load supply source priority.
However, when Grid-tie with backup IV option is selected in PV energy supply
priority, the inverter is only operated between two working logics based on
defined peak time and off-peak time of electricity. Only peak time and off-peak
time of electricity are able to set up for optimized electricity usage.
Grid-Tie: PV power only can feed-in back to grid.
Off-Grid: PV power only provides power to the load and charge battery. No
feed-in back to grid is allowed.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MPP Solar MPI 12KW WP and is the answer not in the manual?

MPP Solar MPI 12KW WP Specifications

General IconGeneral
BrandMPP Solar
ModelMPI 12KW WP
CategoryInverter
LanguageEnglish

Related product manuals