1. Drill six holes in the marked
locations with supplied six screws.
The reference tightening torque is
35 N.m.
5. Grid (Utility) Connection
5-1. Preparation
NOTE: The overvoltage category of the AC input is III. It should be connected to the
power distribution.
NOTE2: Before connecting to grid, please install a separate AC breaker between
inverter and grid. The recommended of AC breaker is 40A.
WARNING! It's very important for system safety and efficient operation to use
appropriate cable for grid (utility) connection. To reduce risk of injury, please use the
proper recommended cable size as below.
Suggested cable requirement for AC wire: