6
1. Drill six holes in the marked
locations with supplied six screws.
The reference tightening torque is
35 N.m.
2. Fix the inverter on the wall.
3. Check if the inverter is firmly
secured.
5. Grid (Utility) Connection
5-1. Preparation
NOTE: The overvoltage category of the AC input is III. It should be connected to the
power distribution.
NOTE2: Before connecting to grid, please install a separate AC breaker between
inverter and grid. The recommended of AC breaker is 40A.
WARNING! It's very important for system safety and efficient operation to use
appropriate cable for grid (utility) connection. To reduce risk of injury, please use the
proper recommended cable size as below.
Suggested cable requirement for AC wire:
Nominal Grid Voltage
230VAC per phase
Conductor cross-section (mm
2
)
10-16
AWG no.
8-6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MPP Solar MPI 12KW WP and is the answer not in the manual?

MPP Solar MPI 12KW WP Specifications

General IconGeneral
BrandMPP Solar
ModelMPI 12KW WP
CategoryInverter
LanguageEnglish

Related product manuals