EasyManuals Logo

MTU 12V2000Gx6 series User Manual

MTU 12V2000Gx6 series
239 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #135 background imageLoading...
Page #135 background image
Final steps
1. Clean mating faces on cylinder head and charge-air pipe.
2. Check gaskets for damage and replace as necessary.
3. Coat gaskets with assembly compound and place on cylinder head.
4. Install leak-off-fuel lines.
5. Install charge-air pipes.
6. Install Engine Control Unit (→ Page 219).
7. Open fuel supply line.
8. Vent fuel system (→ Page 136).
MS15054/03E 2018-07 | Fuel System | 135
TIM-ID: 0000050910 - 007

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MTU 12V2000Gx6 series and is the answer not in the manual?

MTU 12V2000Gx6 series Specifications

General IconGeneral
BrandMTU
Model12V2000Gx6 series
CategoryEngine
LanguageEnglish

Related product manuals