Part Number 9294699 12/16/15 13
Step-by-Step Installation
These instructions are provided to assist the qualified
installer. Contact your Manitowoc Foodservice Service
Agent or call Manitowoc Foodservice for information
regarding start-up services.
Important
Failure to follow these installation guidelines may affect
warranty coverage.
PREINSTALLATION CHECKLIST
Keep product bags in a cooler at least 24 hours
prior to installation.
Any damage should be noted and reported to the
delivering carrier immediately.
Check the lower portion of the unit to be sure
casters are not bent.
Visually inspect the refrigeration package,
compressor compartment housing. Be sure lines
are secure and base is still intact.
Inspect installation location behind the BIC for
electrical outlet location, CO
2
, water hose fittings,
and shutoff.
Check voltage at outlet dedicated for BIC.
Verify floor of install location is level front to back,
side to side and all casters are touching the floor.
n
Warning
The mass of this appliance will allow it to move
uncontrolled on an inclined surface. Adequate means
must be provided to prevent uncontrolled movement
at all times.
Remove the side panels from the unit to make the
board connections, Air/CO
2
and Water Regulator
gauges accessible.
Check that board connections are secure and did
not vibrate loose during shipment.
Check that both micro switches are in line with the
motor above the blenders.
Section 2
Installation