Part Number 9294699 12/16/15 17
Section 2 Installation
Calibrate
See “Calibration Procedure” on page 29
19. Product calibration can be performed once operating
temperature has been reached. Once completed, the
Blend-In-Cup machine is ready for use.
20. Reinstall all side panels.
21. Push the BIC unit into place.
22. Verify the unit is level and shim if necessary.
Demonstrate
23. Demonstrate using the Interface. See “Touch Screens”
on page 21.
24. Demonstrate how to make drink. See “Procedure to
Make a Drink” on page 24.
25. Demonstrate Manager Menu options, using the
default password. (The password can be changed.) See
“Manager’s Menu Screen” on page 27.
26. Set date and time to activate warranty.
27. Complete start-up form, sign, and have store manager
sign form. (Fax to number on form.)
POST INSTALLATION CHECKLIST
Has the machine been properly sanitized?
Has each flavor been installed and primed?
Has ice been added to the bin?
Have the all regulators been correctly set during
flowing conditions?
Is the machine cycling ON/OFF on the temperature
control?
Has the owner/operator been instructed regarding
maintenance procedures?
Has the owner/operator completed the warranty
registration card?