— Must be performed by a technician —
62
damage to the electronic circuits, be sure to turn off the main power switch
before starting work.
cables.
outline of the connections.
distributor.
(1) Example of connection.
Set the PCB ID of each machine before performing communication-linked VS
Communication cable [5 m]
(supplied with the machine)
NBLINE router
(Designated router
connected to NBLINE)
Communication cable [1 m]
(supplied with the machine)
Contents router
(supplied with the machine)
PCB ID: 1 PCB ID: 2 PCB ID: 3 PCB ID: 4