EasyManua.ls Logo

NEC NEAX 2000 IPS - Page 190

NEC NEAX 2000 IPS
262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2 TROUBLESHOOTING
– 180 – NWA-008847-001 Rev.3.0
a6ch2001.fm
Remedial Action on Each Lamp Status
Continued on next page
CARD NAME
LAMP
STATUS
FAULT
CONTENT
REMEDIAL ACTION
PN-DAIA-A
(DAIA)
RUN lamp is not
flashing
Abnormal opera-
tion of DAIA card
Reset the MB switch.
(DownUpDown)
Check the setting of SENSE switch
and SW1-4.
If the fault cannot be cleared,
replace the card.
LINK lamp is not
on
Layer 2 link con-
nection failure
between DAIA
and DAIB
Check to see if the cable between
DAIA and DAIB is correctly con-
nected.
Reset the MB switch.
(DownUpDown)
RED lamp is on PCM signal loss or
Frame Alignment
signal loss
Check to see if the cable between DAIA
and DAIB is correctly connected.
RMT lamp is on Remote alarm Check to see if the cable between DAIA
and DAIB (sending side) is correctly
connected.
1
2
SW1-4: ON SW1-4: OFF
SENSE
Switch: 0
Not used FP No.16
SENSE
Switch: 1
FP No.01 FP No.17
SENSE
Switch: 2
FP No.02 FP No.18
SENSE
Switch: 3
FP No.03 FP No.19
SENSE
Switch: 4-F
Not used
3
1
2
FAULT DIAGNOSIS AND TROUBLESHOOTING

Table of Contents

Other manuals for NEC NEAX 2000 IPS

Related product manuals