SETUP
Unpacking and Inspection
Performance Verification
List of Components
Monitor Setup
Language Selection
UNPACKING
AND
INSPECTION
Notify the carrier if the shipping carton is damaged. Unpack the
N-395 and coinponents. If anything is
inissing or damaged,
contact Mallinckrodt Technical Services Department or your
local Mallinckrodt representative.
PERFORMANCE VERIFICATION
The N-395 performance can be verified by following the
procedures outlined in the
Performance Vevzjication
section of
the N-395 service manual. Qualified service
persoilnel should
perform this procedure before using the monitor for the first time
in a clinical setting.
LIST
OF
COMPONENTS
1 N-395 Pulse Oximeter
1
~ellcor" sensor or assortment pack
1
SCP-10 or
MG-
10 Pulse Oxiineter Sensor Cable
1
N-395 Operator's Manual
1
Hospital Grade Power Cord
2
Fuses