EasyManua.ls Logo

NLB 1012D - Page 21

Default Icon
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Revision 1
D.
Operational Procedures
Work
Area
All personnel working or entering the barricaded area while cleaning or cutting is in progress
shall wear the required protective equipment in accordance with the job conditions.
Pressuring System
Pressure shall be increased slowly on the system while being inspected for leaks and/or
faulty components. All leaks or faulty components shall be repaired or replaced.
System
shall be de-pressurized
to
effect repairs.
Caution:
Never leave the system unattended when pressurized.
E.
Training
Cutting Action
Demonstrate the cutting action and potential hazard involved through the use
of
audio-visual
aids or actual use
of
the equipment. Cut through a piece
of
lumber, dissect a grapefruit, etc.
Personal Protective Equipment
Explain the minimum personal protective equipment required. Instruct when and how
specific limb guards, special clothing and other types
of
devices should be worn per type
of
work performed, locations, etc.
System Operation
Explain the operation
of
the system, pointing out potential problems and proper corrective
action.
Safety Devices
Explain the reason for, and operation of, safety devices. Stress the importance
of
not
tampering with any safety devices.
Hose
Explain the proper method
of
connecting hoses, including laying out without kinks,
protection from excessive wear and proper tools to use on couplings and fittings.
General
The system shall be de-pressurized any time the system is not in use.
The system shall be de-pressurized any time an unauthorized person enters the barricaded
area.
The system shall be de-pressurized when any replacement or repairs are made to the system.
© Copyright January,
2001
NLB Corporation 2-11

Table of Contents

Related product manuals