System Setup
3-5
Part 1604857-04
E 2014 Nordson Corporation
VBF System Setup
This procedure applies to mobile systems with a vibratory box feeder.
1. Unpack the pickup arm, collar and set screw, pickup tube, and pump.
2. See Figure 3-5. Install the pickup arm as shown, using four M5 x 10
screws with integral washers (3).
1
2
3
Figure 3-5 Pickup Arm Installation
1. Arm
2. Arm bracket
3. M5 x 10 screws (x 4)
3. See Figure 3-6. Install the collar (1) on the pickup tube (2) as shown.
Tighten the socket-head screw to secure the collar.
1
2
3
4
Figure 3-6 Collar Installation on Pickup Tube
1. Collar
2. M5 socket head screw (black)
3. Pickup tube
4. Pump mount