EasyManua.ls Logo

Nordson ProBlue Fulfill - Assemble the Transfer Hose, Air Line, and Suction Lance

Nordson ProBlue Fulfill
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ProBlue Fulfill Integrated Fill System
14
Part 1101094_02
E 2012 Nordson Corporation
AssembletheTransferHose,AirLine,andSuctionLance
SeeFigure9.
1. Using one hose clamp, attach the transfer hose (A) to the end of the
suction lance (B).
2. Use the remaining hose clamp to attach the transfer hose to the feed
system inlet tube (C).
NOTE: If necessary, loosen the inlet tube retaining screws and
reposition the inlet tube.
3. Connect the air line (D) to the suction lance air inlet (E).
NOTE: Extension kits a re available if longer hose/air line l engths are
needed. Refer to Parts for the extension kit part numbers.
4. Route the air line along the transfer hose, securing it with cable ties a s
you go.
5. Leaving enough air line to reach the outlet (G) of the air solenoid, cut the
air line to length and then insert the end of the air line into the outlet.
CAUTION! Risk of equipment damage. To keep the suction lance from
clogging, do not
S put adhesive in the white PCV tube that houses the suction lance,
and
S do not apply excessive force to the suction lance when inserting it in
the tube.
6. Insert the suction lance into the adhesive storage bin.
7. Connect a regulated, clean, dry air supply to the regulator inlet (F). The
air supply must be capable of supplying 3.45-5.51 bar ( 50-80 psi) at
24 scfm.

Related product manuals