20 Installation
2583703_EN_1608 Nortec GS
Power Supply
The power supply to the humidier must not exceed the rated current draw indicated on the speci-
cation label. Refer to Figure 3 on page 10.
The power supply must have an external dedicated fused disconnect switch located in the immediate
vicinity of the humidier. The fusing must not exceed the maximum current draw of 15 A.
5.4 Mounting the Humidier
Before mounting the Nortec GS humidier, refer to "Site Requirements" on page 18 for the location and
mounting requirements.
5.4.1 Clearances
The required clearances are listed in Table 9 on page 21, and the suggested clearances are listed in
Table 10 on page 21. Refer to Figure 7. Consult local and national installation regulations. Nortec does not
accept responsibility for violations of the installation codes.
Figure 7:
C
A
B
D
E
F
Nortec GS Humidier Suggested Clearances