3 Operation
Grid Connect Photovoltaic Inverter KP100L-OD- USER’S MANUAL
3-4 State Display
3
9
3-4 State Display
The display according to the state of the KP100L is done. State Display includes Normal Display and Error
Display.
Normal Display
When the error doesn't occur in the KP100L, the follow content corresponding to the state of the KP100L is
displayed.
The Display [2] shows data and the state corresponding to the state of KP100L at that time.
The Display [3] shows the measurement value. Select the measurement value that you want to display by
pushing the "<<" or ">>" key. The displayed item is changed every 0.5 seconds when you keep pushing the "<<"
or ">>" key. The Display [1] shows the item name of the data displayed in the Display [3].
Refer to the follow table for the item that you can select.
State Display (example) Content of Date
Countdown 30s Start-up delay time
Start waiting Standby -
Running 1.23kW AC Power
Stopping OFF -
Item name Measurement Value Data display form
Pac AC Power(L1 phase/L2 phase/L3 phase) 1.23/1.23/1.23kW
Pdc1/2/3 DC Power (DC1/DC2/DC3) 1.23/1.23/1.23kW
Vac Grid Voltage(L1 phase/L2 phase/L3 phase) 230/230/230V
Freq Grid Frequency 50.0Hz
Iac AC Current (L1 phase/L2 phase/L3 phase) 12.3/12.3/12.3A
Vdc1/2/3 DC Voltage (DC1/DC2/DC3) 400/400/400V
Idc1/2/3 DC Current (DC1/DC2/DC3) 12.3/12.3/12.3A
E-today Daily energy production 123.4kWh
H-total accumulated operation time 123456hr
E-total Total Periodic Energy (accumulated energy from time user reset) E-total can be reset
by user. Refer to section "User Setting" in "3-5" [15] Clear of Total Periodic Energy
12345kWh
Pac 3.69kW
Pdc1/2/3 3.69kW
1.28/1.28/1.28kW
<<
<<
>>
>>
Pac 30s
Pac Standby
Countdown
end
preparation
completion
Pdc1/2/3 30s
<<
<<
>>
>>
Pdc1/2/3 Standby
0.00/0.00/0.00kW
0.00/0.00/0.00kW
<<
<<
>>
>>
Start waiting Display
Countdown Display
Running Display
0.00/0.00/0.00kW
0.00/0.00/0.00kW
1.23/1.23/1.23kW