EasyManuals Logo

Oracle Acme Packet 6350 User Manual

Default Icon
131 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
4
System Installation
This chapter provides information about how to install the Acme Packet 6300/6350
and its associated components, includes cabling information.
Shipped Parts
Each Acme Packet 6300/6350 ships in one box. Inside this box is the Acme Packet
6300/6350 chassis and the accessory kit. The ordered Network Interface
Unit (NIU) and power supplies are already installed in the
chassis.
The following table lists the contents of one Acme Packet 6300/6350 order.
Table 4-1 Acme Packet 6300/6350 Shipping Contents
Location Item
Main Shipping Box Acme Packet 6300/6350 chassis
Accessory Kit DB9 to RJ45 console adapter
AC or DC power cords
Grounding cable with lug
Slide extender kit for rack mounting
Installation Tools and Parts
The following tools and parts are required to install the Acme Packet 6300/6350 into
your equipment rack:
#2 Phillips-head screwdriver
Rack and associated mounting hardware
Shielded Ethernet CAT5e or CAT6 RJ45 cables
11/32" nut driver
Recommended Tools and Parts
Oracle recommends that you have the following parts on hand:
Cable labels
UPS for AC installations
ESD wrist or heel straps
ESD-safe location
4-1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle Acme Packet 6350 and is the answer not in the manual?

Oracle Acme Packet 6350 Specifications

General IconGeneral
BrandOracle
ModelAcme Packet 6350
CategoryController
LanguageEnglish

Related product manuals